Staircase Renovation Projects Across Toronto and the GTA
Real rebuilds, recapping jobs, iron baluster installs and curved staircase renovations across the GTA. Named by neighbourhood, priced, dated and shown before and after.
Bloor West Village Full Oak Rebuild
A Bloor West Village homeowner wanted the carpeted builder-grade stairs replaced with red oak treads and black iron balusters to match their new hardwood. Cut in our Etobicoke shop and fitted in five days, including trim and finish.
Client
Homeowner, renovation
Timeline
5 days
Rosedale Iron Baluster Install
A Rosedale homeowner swapped out dated white colonial spindles for black twisted iron balusters without touching the existing oak handrail or treads. Two-day install with no refinishing required.
Client
Homeowner
Timeline
2 days
Etobicoke Vinyl Stair Capping
An Etobicoke landlord needed the basement unit staircase upgraded between tenants without the budget for a full rebuild. We capped the existing treads and risers in warm oak-look vinyl in two days.
Client
Rental landlord, tenant turnover
Timeline
2 days
Markham Curved Staircase Rebuild
An Unionville homeowner wanted the curved staircase in their 1998 build rebuilt with white oak treads and a continuous handrail. On-site templated and fitted by hand over nine days.
Client
Homeowner, full renovation
Timeline
9 days
North York Hardwood Refacing
A Lawrence Park homeowner refaced their original stained oak staircase with 3/4 inch white oak overlay to match the new main-floor hardwood. Finished in four days with the structural stringers intact.
Client
Homeowner, flooring refresh
Timeline
4 days
Mississauga White Oak Recap
A Port Credit homeowner recapped their 20-year-old builder-grade staircase with solid white oak treads and risers in three days. Finished to match the newly refinished main-floor hardwood.
Client
Homeowner
Timeline
3 days
Vaughan Basement Stair Renovation
A Thornhill homeowner was finishing their basement and needed the staircase upgraded with closed risers and new oak treads. Four days from demo to finish, meeting the Ontario Building Code for finished basements.
Client
Homeowner, basement finishing
Timeline
4 days
Oakville Stair Tread Replacement
An Oakville homeowner replaced worn pine treads on their foyer staircase with solid matte-finished oak. Risers and stringers stayed intact, finished in three days.
Client
Homeowner
Timeline
3 days
Scarborough Newel Post and Handrail
A Guildwood homeowner swapped a turned builder-grade newel post for a modern square post in stained walnut and matched the handrail. Two-day install, no stair rebuild required.
Client
Homeowner
Timeline
2 days
Richmond Hill Open-Riser Refacing
A Richmond Hill homeowner refaced their 20-year-old open-riser staircase with solid walnut treads and a continuous walnut handrail. Five days from strip to finish, Ontario Building Code compliant on landing guards.
Client
Homeowner
Timeline
5 days
Have a Project Like These?
Senior lead on every in-home estimate. Written quote within 48 hours.